Length of Project:
Aug 2004 – Nov 2004 |
Customer:
Sembawang Marine & Offshore Engineering |
|
Description of Work:
OXY PLATFORM
- Provision of technical manpower for the
mechanical completion, loop checking, troubleshooting and start up of
various utilities, process systems, including DCS, Fire and Gas System,
ESD, Gas Turbines and Compressors.
|
Length of Project:
Apr 2004 – Jun 2004 |
Customer:
CACT Operators Group
|
|
Description of Work:
FPSO NAN HAI FA XIAN
(onshore and offshore)
Turnkey project on retrofitting, upgrading and
commissioning of existing FPSO, carried out onshore in Singapore and
offshore at South China Sea . Scope of work include:
- Retrofitting of entire Fire and Gas System.
- Installation and commissioning of new Topside Process Modules.
- Supply, design and commissioning of Cargo Pumps, Ballast Pumps and Alarm & Monitoring System.
- Upgrading, troubleshooting and commissioning of Power Technicians Control System.
- Calibration, loop checking and function testing of Topside Process Modules electrical and control equipment.
- Assisting in troubleshooting and start up of Process Equipment, Turbo Generators, Cargo Pumps, Metering System, etc…
|
Length of Project:
Oct 2003 – Oct 2004 |
Customer:
Kellogg Brown & Root |
|
Description of Work:
FPSO BELANAK
- Provision of technical manpower involving
expertise in electrical, instrumentation, mechanical, fire & gas,
telecommunication and HVAC systems to carry out work scope involving
mechanical completion checks, commissioning of Marine Utilities System,
Topside Utilities System, Power Generation System, Topside Oil and Gas
Production System, etc…
|
Length of Project:
Sep 2003 – Mar 2005 |
Customer:
Sembawang Marine & Offshore Engineering |
|
Description of Work:
DAN FG
- Construction and commissioning of Topside
Module, Electrical, Instrumentation, Telecommunication, Fire & Gas
Control and Monitoring Systems.
|
Length of Project:
May 2003 – Jul 2003 |
Customer:
Yokogawa France S.A.
|
|
Description of Work:
EXTENSION ALARM SYSTEM FOR HHI LNG CARRIERS
- Design, engineering and supply of Redundant
PLC-based Gateway and Redundant Profibus-based Extension Alarm Panels
for LNG Carriers built by HHI.
|
Length of Project:
Apr 2003 - Nov 2004 |
Customer:
Shell International Trading and Shipping Company |
|
Description of Work:
LNG GALEOMMA
- Design and supply of Boiler Control System to replace existing outdated system.
- Design, fabrication and installation of Dual
Redundant PLC-based System for Boiler Management System and Nitrogen
Purging System, including the Alarm Monitoring Functions for the
Systems.
- Design, fabrication and installation of
Automatic Control Valve System for Barrier and Inter Barrier Spaces,
including Alarm Monitoring Function.
|
Length of Project:
Mar 2003 - Dec 2003 |
Customer:
Single Buoy Moorings Inc. |
|
Description of Work:
FPSO XIKOMBA
Provision of technical manpower to carry out the following work scope, including:
- Perform mechanical completion checks and loop checks.
- Perform checks on Fire and Gas System, ESD System and Topside Process System.
- Carry out inspection and witness test on existing electrical and instrumentation refurbishments.
- Perform alignment check on rotating/static
equipment such as Power Turbine, Gas Compressor, Pumps, Valves, Fans,
Blowers, etc...
|
Length of Project:
Sep 2002 - Nov 2002 |
Customer:
Shell International Trading and Shipping Company |
|
Description of Work:
LNG DELTA
- Design, fabrication and installation of Dual Redundant
PLC-based System for Boiler Management System and Nitrogen Purging
System including Alarm Monitoring Functions for the Systems.
- Design, fabrication and installation of Automatic Control
Valve System for Barrier and Inter Barrier Spaces, including Alarm
Monitoring Function.
|
Length of Project:
Apr 2002 – Apr 2003 |
Customer:
Jurong Shipyard Singapore
|
|
Description of Work:
FSO KOMERKRIBI-1
- Conversion of existing tanker into fuel storage and offloading unit involving electrical and instrumental work.
|
Length of Project:
Early 2002 - ONGOING |
Customer:
Yokogawa Japan |
|
Description of Work:
UPGRADE WORK FOR LNG CARRIER TENAGA-TIGA
- Installation of new DCS systems for Engine Room and Cargo Control Systems.
- 4 LNG carriers of Tenaga Fleet completed.
|
Length of Project:
Year 2002- Ongoing |
Customer:
Shell IMR Japan |
|
Description of Work:
UPGRADE OF 7 B-CLASS GAS VESSELS
- Upgrading of HD Compressors Controls on 7 operational gas ships.
|
Length of Project:
June 2000 - 2004 |
Customer:
Yokogawa Japan |
|
Description of Work:
TENAGA FLEET DCS IMPLEMENTATION
TENAGA-SATU, DUA, EMPAT & LIMA
- Site survey during voyage.
- Design, fabrication, System Integration of Marshalling Cabinets and consoles.
- Design, construction, testing and commissioning of PLC based Extension Alarm Systems.
- Design modifications and implementation of Boiler Control systems.
- Installation of all panels and consoles during 90-day docking period at Yokohama. Japan
|
Length of Project:
June 2000 - July 2002 |
Customer:
Kuwait Oil Tanker Company (S.A.K.), Kuwait |
|
Description of Work:
GAS AL MINAGISH
- Design, construction installation and testing
of dual redundant Alarm monitoring system for engine room, Cargo
control room and Bridge.
- Design, construction and testing of electrically
operated system to replace obsolete, existing Pneumatic control system
for Cargo and Ballast Valves.
- Replacement of entire Engine Control Room and Cargo control room automation relay system.
- Implementation of the above jobs at Singapore and Arab Shipbuilding and Repair Yard Co. ASRY. Bahrain.
|
Length of Project:
May 2002 |
Customer:
Yokogawa France S.A., France |
|
Description of Work:
EXTENSION ALARM SYSTEM FOR HHI LNG CARRIER HULL NO. H1444
- Design, Engineering, & Supply of Redundant
PLC based gateway and Redundant Profibus based Extension Alarm Panels
for LNG Carrier being built by HHI
|
Length of Project:
Mar 2002 - Apr 2002 |
Customer:
Kuwait Oil Tanker Company (S.A.K.), Kuwait |
|
Description of Work:
GAS AL AHMADI
- Design, construction installation and testing
of dual redundant Alarm monitoring system for engine room, Cargo
control room and Bridge.
- Design, construction and testing of electrically
operated system to replace obsolete, existing Pneumatic control system
for Cargo and Ballast Valves.
- Replacement of entire Engine Control Room and Cargo
control room automation relay system. Design, construction and
installation of Ballast Pump discharge Valve control system.
- Implementation of the above jobs at Singapore and Dubai dry docks.
|
Length of Project:
Dec 2001 - Jan 2002 |
Customer:
Kuwait Oil Tanker Company (S.A.K.), Kuwait |
|
Description of Work:
GAS AL BURGAN
- Design, construction installation and testing
of dual redundant Alarm monitoring system for engine room, Cargo
control room and Bridge.
- Design, construction and testing of electrically
operated system to replace obsolete, existing Pneumatic control system
for Cargo and Ballast Valves.
- Replacement of entire Engine Control Room and Cargo control room automation relay system.
- Implementation of the above jobs at Singapore and Dubai dry docks.
|
Length of Project:
Sep 2001 - July 2002 |
Customer:
Single Buoy Moorings Inc., Switzerland |
|
Description of Work:
FPSO BRASIL
- Design, construction, installation, testing and
commissioning of H60 rated Turret Equipment Room complete with
ventilation and air conditioning system for use in Class 1, Division 1
hazardous area.
|
Length of Project:
Dec 2000 - Mar 2001 |
Customer:
Sembawang Shipyard Pte Ltd |
|
Description of Work:
FSO SOORENA
- Conversion of an existing Oil Tanker into Fuel Storage and Unloading Unit, involving E & I works.
|
Length of Project:
Feb 2001 |
Customer:
Yokogawa France S.A., France |
|
Description of Work:
EXTENSION ALARM SYSTEM FOR HHI LNG CARRIER HULL NO. H1429
- Design, Engineering, & Supply of Redundant
PLC based gateway and Redundant Profibus based Extension Alarm Panels
for LNG Carrier being built by HHI.
|
Length of Project:
Sept 2000 - Mar 2001 |
Customer:
Sembawang Marine & Offshore Engineering |
|
Description of Work:
MALAMPAYA PLATFORM
- Commissioning of Controls and Safety System for
Solar Gas Turbines, Speed Control and Safeties for Rolls Royce Engines
for Gas Compressors, Controls and Safeties for Control Air Compressors,
Fisher-Rosemount Delta-V DCS system field I/Os, Process Control
Systems, Moore QUADLOG system for Fire, Gas and ESD.
|
Length of Project:
Aug 2000 - Nov 2000 |
Customer:
FPSO Construction Inc. (Brazil) |
|
Description of Work:
FPSO PETROBRAS P-38
- Commissioning of Process equipment, low and
medium voltage switchboards, Vessel Monitoring System, Fire, Gas and
ESD system, Installation of Process Instruments, Loop checking, quality
assurance and documentation.
- Calibration of Safety Valves, All monitoring, control and safety devices on the process equipment.
- Running and operation of marine machinery.
|
Length of Project:
Jul 2000 - Nov 2000 |
Customer:
Nuovo Pignone (Italy) |
|
Description of Work:
FPSO PETROBRAS P-40
- Commissioning of Nuovo Pignone Mark-5 Gas
Turbines, Installation of Process Instruments, Clearing of E&I
punch list, Looping checking, quality assurance and documentation.
- Calibration of all monitoring, control and safety devices on the process equipment and Running and operation of machinery.
|
Length of Project:
Aug 2000 - Dec 2000 |
Customer:
Rosemount Shanghai Co. Ltd, Shanghai, China |
|
Description of Work:
- Design, Engineering & Supply of Central
Control Console including Emergency Shutdown System (Redundant PLC
based), Extension Alarm System and Loading Calculation Software for
Hull part of FPSO-2 being built by Dalian New Shipyard for CNOOC.
|
Length of Project:
Apr 2000 - Nov 2000 |
Customer:
Rosemount Shanghai Co. Ltd, Shanghai, China |
|
Description of Work:
- Design, Engineering & Supply of Central
Control Console including Emergency Shutdown System (Redundant PLC
based), Extension Alarm System, Lighting Monitoring Mimic Panels and
Loading Calculation Software for Hull part of FPSO-1 being built by
Dalian New Shipyard for CNOOC.
|
Length of Project:
June 2000 - Dec 2000 |
Customer:
Yokogawa France S.A., France |
|
Description of Work:
EXTENSION ALARM SYSTEM FOR HHI LNG CARRIER HULLS NO. H1295 / 1296
- Design, Engineering, & Supply of Redundant
PLC based gateway and Redundant Profibus based Extension Alarm Panels
for LNG Carriers being built by HHI.
|
Length of Project:
Oct 1999 - May 2001 |
Customer:
Aiolos Engineering Corporation, Canada |
|
Description of Work:
LOW SPEED WIND TUNNEL UNIVERSITI TEKNOLOGI MALAYSIA
- Design, Engineering, Supply, Installation and
Commissioning of Electrical and Control systems including Computer
Networking system.
|
Length of Project:
Nov 1999 - Nov 2000 |
Customer:
Baker Process |
|
Description of Work:
FPSO PETROBRAS P-40
- Commissioning and Installation of Process
equipment, Clearing of E&I punch list, Loop checking, quality
assurance and documentation
- Calibration of Safety Valves, All monitoring, control
and safety devices on the process equipment and running and operation
of marine machinery.
|
Length of Project:
Oct 1999 - Apr 2000 |
Customer:
Shell International Trading and Shipping Co. Ltd |
|
Description of Work:
LNG BONNY
|
Length of Project:
Sept 1999 - Mar 2000 |
Customer:
Keppel Shipyard Pte Ltd |
|
Description of Work:
FPSO-VI, ESPADARTE
- Renewal of burner management and combustion control system for 2 boilers.
- Repair and reactivation of Engine Room Alarm Monitoring System.
- Design of controls for about 27 motor starters for automatic and standby operation.
- Loop checking, quality assurance and documentation.
|
Length of Project:
Aug 1999 - Feb 2000 |
Customer:
Maritima Overseas Inc. (Brazil) |
|
Description of Work:
FPSO PETROBRAS P-37
- Commissioning of Process equipment, low and
medium voltage switchboards, vessel monitoring system, fire, gas and
ESD system, Nuovo Pignone Mark-5 Gas Turbines, Installation of Process
Instruments, Loop checking, quality assurance and documentation.
- Calibration of Safety Valves, All Monitoring, Control
and Safety devices on the process equipment and running and operation
of marine machine.
|
Length of Project:
Aug 1999 - Sep 1999 |
Customer:
Stork Engineers and Contractors BV, Sri Lanka |
|
Description of Work:
SHELL TERMINALS LANKA SRI LANKA
- Design and Supply - Lighting columns & Control gear.
|
Length of Project:
Jan 1999 - June 1999 |
Customer:
PFV International, Singapore |
|
Description of Work:
BAHAI PLATFORM J29-3 CHINA
- Supply and Commission Explosion proof Oil in Water Analyzer.
|
Length of Project:
Jan 1999 - July 1999 |
Customer:
McDermott SEA, Singapore |
|
Description of Work:
LB - 30
- Design, Supply and Commission - Ballast Control system.
|
Length of Project:
June 1998 - Sep 1998 |
Customer:
Nortrans Engineering |
|
Description of Work:
RUBY PRINCESS
- Design and fabricate control panels.
|
Length of Project:
June 1998 - Sep 1998 |
Customer:
DDC Electronics Singapore |
|
Description of Work:
DRILLSHIP - VALENTIN SHASHIN
- Design and fabricate control panels.
|
Length of Project:
Sep 1998 - Dec 1998 |
Customer:
ST Marine Singapore |
|
Description of Work:
RORO VESSEL 140M LANDING SHIP TANK
- Supply of Hull Stress Monitor.
|
Length of Project:
Mar 1998 - Oct 1999 |
Customer:
Woodside Energy Ltd |
|
Description of Work:
LAMINARIA & CORRALINA FPSO SEMBAWANG SHIPYARD
- To provide Engineering Services for the FPSO conversion.
|
Length of Project:
Jan 1998 - Dec 1998 |
Customer:
Shell International Trading and Shipping Co. Ltd |
|
Description of Work:
LNG FINIMA
|
Length of Project:
Jan 1998 - Dec 1998 |
Customer:
Sembawang Utilities and Terminals, Singapore. |
|
Description of Work:
MAINTENANCE SERVICES SEMBAWANG UTILITIES AND TERMINALS - PULAU SAKRA
- To provide maintenance services for the
Boilers, Chilling water systems, Drumming systems, Tank farm,
Electrochlorination systems and Electrical Substations.
- To assist in the commissioning activities for the new Steam generation units - 3 nos.
|
Length of Project:
Jan 1998 - Dec 1998 |
Customer:
American Bureau Of Shipping |
|
Description of Work:
PORT OF SINGAPORE AUTHORITY - PASIR PANJANG
- To provide Inspection Services to ABS for 24
numbers of Overhead Bridge Cranes (OHBC) at the Pasir Panjang Terminal
and site inspection services at the Mitsui-Keppel consortium
construction site at Keppel Shipyard.
|
Length of Project:
Mar 1998 - Mar 2002 |
Customer:
TBV Power, Port Klang, Malaysia |
|
Description of Work:
PORT KLANG POWER PLANT 2X600 MW
TENAGA NASIONAL BERHAD MALAYSIA
- Provide Commissioning Services for the Instrumentation and Electrical systems.
- Provide Operational Personnel for the operation of the plant upon successful completion of commissioning.
|
Length of Project:
Jan 1998 - Jun 1999 |
Customer:
Dubai Dry Docks, Dubai U.A.E. |
|
Description of Work:
OPTIMIZATION OF FPSO COSSACK PIONEER
- Provide E & I Works.
- Upgrading of Control System for about 140 valves with
renewal of control system and addition of extra accumulators,
automating the controls of essential valves, and running of seamless
hydraulic pipes.
|
Length of Project:
Aug 1997 - Oct 1999 |
Customer:
Trenergy FPSO Sdn. Bhd., Kuala Lumpur, Malaysia |
|
Description of Work:
PERINTIS - FPSO MALAYSIA SHIPYARD & ENGINEERING
- Engineering and Project Management Services for
Trenergy FPSO to enable conversion of the MT HITRA into the FPSO
PERINTIS for Petronas Carigali Bhd.
- Enable successful commissioning to be completed at Malong, Sotong and Anding (MASA) oil field area in the South China Sea.
|
Length of Project:
Sep 1997 - Dec 1997 |
Customer:
Shell International Trading and Shipping Co. Ltd |
|
Description of Work:
MV SOLARIS
|
Length of Project:
June 1997 - Nov 1997 |
Customer:
Gas Services Int., Singapore |
|
Description of Work:
SEMISUBMERSIBLE FLOATING PRODUCTION PLATFORM -P27
PETROBRAS
- Installation of instrumentation on the Process skids.
|
Length of Project:
Dec 1996 - Mar 1997 |
Customer:
Thorensen & Co. (Bangkok) Ltd, Bangkok, Thailand |
|
Description of Work:
SWITCHBOARDS AND ALARM PANELS
M.V. HALLBORG
- Totally refurbish burnt out switch boards, engine control consoles, replace burnt out cabling, test and commission the systems.
|
Length of Project:
Feb 1997 - Mar 1997 |
Customer:
Whitewood Maritime Inc. |
|
Description of Work:
CONTROL PANELS
- Fabricate Bow loading and Aft line control panels.
|
Length of Project:
Feb 1997 - Mar 1997 |
Customer:
Schlumberger / Flopetrol Services Inc. |
|
Description of Work:
CRUDE METERING SKID
- Design and fabrication of a two-run flow metering skid.
|
Length of Project:
Mar 1997 - Oct 1997 |
Customer:
Far East Levingston Shipbuilding Ltd., Singapore |
|
Description of Work:
SAGA HULL B-241
- Electrical installation and Cabling of various skids.
|
Length of Project:
Mar 1997 - Oct 1997 |
Customer:
Foster Wheeler Eastern Pte Ltd, Singapore |
|
Description of Work:
CCR BOOSTER GAS COMPRESSOR PACKAGE MOBIL JURONG REFINERY
- Installation, Testing and Commissioning of Electrical and Instrumentation works including supply of installation material.
|
Length of Project:
Jan 1997 - Apr 1997 |
Customer:
Sempec Utilities and Terminals Pte Ltd, Singapore |
|
Description of Work:
SUT TERMINAL, PULAU SAKRA SINGAPORE
- Installation and termination of cables and equipment on the Service Corridor.
|
Length of Project:
Dec 1996 - Mar 1997 |
Customer:
Sempec Utilities and Terminals Pte Ltd, Singapore |
|
Description of Work:
SUT TERMINAL, PULAU SAKRA SINGAPORE
- Pre-Commissioning checks for boiler and associated plants.
- Prepare and clear punch lists.
|
Length of Project:
Dec 1996 - Mar 1997 |
Customer:
Sembawang Shipyard Ltd, Singapore |
|
Description of Work:
FPSO II
- Supply, install and commission numerous new instrumentation systems.
- Refurbish existing instrument systems in engine room and on deck.
- Upgrade of mooring buoy controls.
- Engineering for Production systems.
- Instrument and Electrical team secondment for final
installation and commissioning of various instruments and electrical
facilities during vessel's passage from Singapore to Brazil.
|
Length of Project:
July 1996 - Dec 1996 |
Customer:
Sembawang Shipyard Ltd, Singapore |
|
Description of Work:
FPSO - TANTAWAN EXPLORER
- Overhaul, reinstatement & modification of engine room control systems
- Hookup and testing of deck process instrumentation.
- Installation and testing of fire and Gas systems.
- Startup and commissioning of process instrumentation.
- Instrument Electrical teams secondment for the
maintenance of various instruments and electrical facilities after
vessel departed for Thailand.
|
Length of Project:
Oct 1995 - Aug 1996 |
Customer:
Foster Wheeler Eastern Pte Ltd, Singapore |
|
Description of Work:
SAFE PROJECT INSTRUMENTATION
- Perform Instrumentation and Electrical works as per scope of contract.
- Install, test and commission Electrical equipment both on-site and off-site.
- Install and termnate both Electrical and Instrument Cabling.
- Provide Expatriate site Management Team.
|
Length of Project:
Feb 1995 - May 1995 |
Customer:
ACT Operators Group, Shenzen, China |
|
Description of Work:
HZ-26 MODIFICATION SHEKOU OFFSHORE (CHINA)
- Install, test and commissioning of Subsea cable, transformer system and panels.
- Install, test and commissioning of electrical works (lighting, grounding and communication).
- Install, test and commissioning of Instrumentation works, heat tracing for pipeline facilities and hydrocyclone.
|
Length of Project:
Dec 1993 - Dec 1995 |
Customer:
Sembawang Shipyard Ltd, Singapore |
|
Description of Work:
DP PIPELAYING VESSEL - SOLITAIRE
- Design, supply, install, test and commissioning
for all controls and instruments at Machinery and Piping systems for
Main diesel engines, Cooling water main systems, Sea cooling main
system, Aux. Cooling water system, Lube oil system, Fuel system,
Thruster and steering gear system, Ballast system, Bilge system, Engine
control system, etc.
- Install, test and commissioning of handling and
mooring equipment including Pipe transfer cranes, Main deck overhead
cranes, Overhead cranes in pipe transfer holds, Overhead cranes in
double joint factory, double joint pipe elevator and double joint
line-up crane.
|
Length of Project:
Dec 1995 - May 1996 |
Customer:
Dubai Dry Dock, U.A.E. |
|
Description of Work:
FPSO CONVERSION NOKOSSA
- Installation of new dual fired boiler control systems for Port and Starboard boilers.
- General engine room instrumentaion.
- Commissioning and plant startup services and assistance.
|
Length of Project:
Dec 1995 - June 1996 |
Customer:
Kvaerner Process Systems, Kuala Lumpur, Malaysia |
|
Description of Work:
E&I WORKS FOR FPSO ESSO BALDER FOR NORWAY
- Design, procure, construct and commission the
electrical and instrument systems for crude oil production and gas
dehydration process packages as well as test separation packages.
- Calibration, loop checks and handover the systems.
|
Length of Project:
Dec 1995 - June 1996 |
Customer:
Kvaerner Process Systems, Kuala Lumpur, Malaysia |
|
Description of Work:
E&I WORKS FOR WWTP GPP2 & GPP3
PETRONAS GAS BHD
- Design, Procure, construct and commission the
electrical and instrument systems for the waste water treatment plants
for GPP2 & GPP3
- Calibration, loopchecks and handover the systems
|
Length of Project:
May 1993 - June 1995 |
Customer:
BP Shipping, United Kingdom |
|
Description of Work:
BOILER CONVERSION / UPGRADE FOR VLCC's
BRITISH SUCCESS, BRITISH SPIRIT, BRITISH SKILL, AUSTRALIAN ACHIEVER
- Engineer, design, assemble, factory test new
Portside & Starboard Boiler Automatic Combustion controls, Burner
Management Systems, Burners, for the four vessels.
- Install, commission and test run the systems during vessel docking in Singapore and the Middle East.
|
Length of Project:
Apr 1995 - May 1995 |
Customer:
Oil Equipment Manufacturing Pte Ltd, Singapore |
|
Description of Work:
OCTANE ENGINE SYSTEM - ANALYZER HOUSE MOBIL REFINERY
- Install, test and commissioning of three CFR engines.
- Install, test and commissioning of sample conditioning panel and distribution equipment main panel.
- Install, test and commissioning of cabling, electrical equipment and instrumentation systems.
- Installation of eight prototype fuel tanks and two buffer tanks.
|
Length of Project:
July 1994 - July 1995 |
Customer:
Keppel Shipyard Limited, Singapore |
|
Description of Work:
FPSO CONVERSION - COSSACK PIONEER
- Service, Supply, installation and commissioning
of machinery and instruments for Main Port and Stbd Boiler related
conversion systems.
- Design, fabrication, installation and commissioning of IGS control panel and installation of instruments for IGS system.
- Supply, fabricate and installation of pumproom machinery and piping.· Supply equipment for new Fire Water System.
|
Length of Project:
June 1994 - Oct 1994 |
Customer:
Keppel Shipyard Limited, Singapore |
|
Description of Work:
FPSO - BAVI
- Material procurement, detail engineering,
installation and precommissioning of process monitoring control panel
and cargo valve hydraulic control panel.
- Install hydraulic system tubing and offskid instruments.
|
Length of Project:
Feb 1994 - Oct 1994 |
Customer:
Keppel Shipyard Limited, Singapore |
|
Description of Work:
FPSO - NAN HAI KAI TUO
- Material procurement, detailed engineering,
installation and pre-commissioning of various engine room's
instrumentation up-grading to meet the FPSO conversion new
requirements.
- Installation and precommissioning of process shut down system, inclusive of tubing installation and cable termination.
- Modify the deck process skids' instruments and electrical installation.
- Precommissioning of the entire process skids' instrumentation and control system.
|
Length of Project:
Dec 1993 - Apr 1994 |
Customer:
Mobil Refinery, Singapore |
|
Description of Work:
AROMATIC / CCR PROJECT
- Provide Instrument Technicians to assist Mobil
Refinery's commissioning team on plant start-up activities. Work
includes final tuning and optimum setting of field instruments, trouble
shooting and rectification of faults occurring during plant start-up
period.
|
Length of Project:
Aug 1993 - Apr 1994 |
Customer:
Asia Badger Inc. |
|
Description of Work:
AROMATIC / CCR PROJECT
- Provide Instrument engineers to review vendor's
drawings and incorporate vendor's instruments into refinery plant
instrumentation and system.
- Provide Instrument Technicians and skilled
Fitters/Electricians to carry out site installation of vendor package's
instruments and punchlist items of other sub-contractors instrument
installation work and its tubing conduits, trays, cables and supports.
- Provide Instrument Technicians to perform loopchecking and fault finding activities during the precommissioning of plant.
- Provide Instrument Technicians to perform mark-up of as-built drawings.
|
Length of Project:
Dec 1993 - Jan 1994 |
Customer:
JHN Oil Operating Co., China |
|
Description of Work:
LF-13-1 PLATFORM
- Reactivation of Instrumentation and control
work involving calibration, overhauling and loop-checking of process
instruments, modification of Process instrumentation and SCADA system.
- Commissioning and startup of process plant and instrumentation.
|
Length of Project:
Oct 1992 - Jan 1993 |
Customer:
Sembawang Shipyard Ltd, Singapore |
|
Description of Work:
FPSO - NIELSTOR
- Refurbishment and modification of hydraulic remote control cargo valve system.
- Installation and commissioning of FPSO process instrumentation.
|
Length of Project:
Aug 1992 - Oct 1992 |
Customer:
Asia Badger Inc. |
|
Description of Work:
INSTRUMENTATION REVAMP PROJECT
- Provide Instrument technicians and skilled fitters to work on calibration, and loop checking instrumentation revamp work.
|
Length of Project:
Feb 1992 - July 1992 |
Customer:
Keppel Shipyard Limited, Singapore |
|
Description of Work:
FPSO - NAN HAI XI WAN
- Refurbishment of deck process instruments and control equipments.
|
Length of Project:
Jan 1992 - June 1992 |
Customer:
Single Buoy Moorings Inc., Switzerland |
|
Description of Work:
FPSO-II
- Refurbishment of Deck process instruments and control equipments.
- Refurbishment of engine room's dual fire boiler control equipments and auxiliary steam plant instruments.
- Supply and commissioning of Chemical injection skid.
- Commissioning and plant start up assistance of West Linapacan field offshore, Philippines.
|
Length of Project:
June 1991 - Dec 1991 |
Customer:
Keppel Shipyard Limited, Singapore |
|
Description of Work:
FPSO SKUA VENTURE
- Installation and hook up of various offskid instruments and termination of control console.
- Service and commissioning of Engine room automation and Boiler control instrumentation.
|
Length of Project:
Jan 1991 - Aug 1991 |
Customer:
Boustead Service Pte Ltd, Singapore |
|
Description of Work:
COMPUTERISATION OF PSA CRANES PSA SINGAPORE
- Installation and testing of Computerised system for 220 units of PSA yard cranes and quay cranes.
|
Length of Project:
Dec 1990 - Feb 1991 |
Customer:
Single Buoy Moorings Inc., Switzerland |
|
Description of Work:
FPSO CHI LINH
VIETNAM WHITE TIGER FIELD
- Start up and commissioning of process instruments and electrical commissioning.
|
Length of Project:
Apr 1990 - Oct 1990 |
Customer:
Keppel Shipyard Limited, Singapore |
|
Description of Work:
FPSO CHI LINH
- Material Procurement, detail engineering, installation and pre-commissioning of various instruments.
- Design, fabricate, install and test the process control panels.
- Installation and pre-commissioning of Fire and Gas system, ESD control panel and system.
|
Length of Project:
Oct 1990 - Oct 1992 |
Customer:
ACT - OG, Shenzen, China |
|
Description of Work:
FPSO - NAN HAI FA XIAN
HZ-21, HZ-26 PLATFORM OFFSHORE CHINA
- Start up and commissioning FPSO process instruments, fire and gas system and tanker facilities.
- Hook up and commissioning of Well-head safety shut- down system.
- Start up and commissioning of Oil and gas Production facilities.
- Instrument and Electrical Team secondment to the maintenance of various instruments and electrical facilities.
|
Length of Project:
Jan 1990 - Aug 1990 |
Customer:
Sembawang Shipyard Ltd, Singapore |
|
Description of Work:
FPSO - NAN HAI FA XIAN
- Supply, installation and commissioning of Deluge Control System
- Evaluation and selection of Process Instruments for configuration according to specifications.
- Installation, hook up, calibration and pre-commissioning of FPSO process instruments.
|
|