Major Projects

Over the years, our customers have entrusted us with larger and more complex projects. The Group undertakes a wide spectrum of jobs, from service and repair work to project and contract- based jobs amounting millions in value.

Below is a list of some significant works undertaken by Total Automation over the years (in reverse chronological order):

Length of Project:
Aug 2004 – Nov 2004
Customer:
Sembawang Marine & Offshore Engineering

Description of Work:

OXY PLATFORM

  • Provision of technical manpower for the mechanical completion, loop checking, troubleshooting and start up of various utilities, process systems, including DCS, Fire and Gas System, ESD, Gas Turbines and Compressors.

Length of Project:
Apr 2004 – Jun 2004
Customer:
CACT Operators Group

Description of Work:

FPSO NAN HAI FA XIAN
(onshore and offshore)

Turnkey project on retrofitting, upgrading and commissioning of existing FPSO, carried out onshore in Singapore and offshore at South China Sea . Scope of work include:

  • Retrofitting of entire Fire and Gas System.
  • Installation and commissioning of new Topside Process Modules.
  • Supply, design and commissioning of Cargo Pumps, Ballast Pumps and Alarm & Monitoring System.
  • Upgrading, troubleshooting and commissioning of Power Technicians Control System.
  • Calibration, loop checking and function testing of Topside Process Modules electrical and control equipment.
  • Assisting in troubleshooting and start up of Process Equipment, Turbo Generators, Cargo Pumps, Metering System, etc…

Length of Project:
Oct 2003 – Oct 2004
Customer:
Kellogg Brown & Root

Description of Work:

FPSO BELANAK

  • Provision of technical manpower involving expertise in electrical, instrumentation, mechanical, fire & gas, telecommunication and HVAC systems to carry out work scope involving mechanical completion checks, commissioning of Marine Utilities System, Topside Utilities System, Power Generation System, Topside Oil and Gas Production System, etc…

Length of Project:
Sep 2003 – Mar 2005
Customer:
Sembawang Marine & Offshore Engineering

Description of Work:

DAN FG

  • Construction and commissioning of Topside Module, Electrical, Instrumentation, Telecommunication, Fire & Gas Control and Monitoring Systems.

Length of Project:
May 2003 – Jul 2003
Customer:
Yokogawa France S.A.

Description of Work:

EXTENSION ALARM SYSTEM FOR HHI LNG CARRIERS

  • Design, engineering and supply of Redundant PLC-based Gateway and Redundant Profibus-based Extension Alarm Panels for LNG Carriers built by HHI.

Length of Project:
Apr 2003 - Nov 2004
Customer:
Shell International Trading and Shipping Company

Description of Work:

LNG GALEOMMA

  • Design and supply of Boiler Control System to replace existing outdated system.
  • Design, fabrication and installation of Dual Redundant PLC-based System for Boiler Management System and Nitrogen Purging System, including the Alarm Monitoring Functions for the Systems.
  • Design, fabrication and installation of Automatic Control Valve System for Barrier and Inter Barrier Spaces, including Alarm Monitoring Function.

Length of Project:
Mar 2003 - Dec 2003
Customer:
Single Buoy Moorings Inc.

Description of Work:

FPSO XIKOMBA

Provision of technical manpower to carry out the following work scope, including:

  • Perform mechanical completion checks and loop checks.
  • Perform checks on Fire and Gas System, ESD System and Topside Process System.
  • Carry out inspection and witness test on existing electrical and instrumentation refurbishments.
  • Perform alignment check on rotating/static equipment such as Power Turbine, Gas Compressor, Pumps, Valves, Fans, Blowers, etc...

Length of Project:
Sep 2002 - Nov 2002
Customer:
Shell International Trading and Shipping Company

Description of Work:

LNG DELTA

  • Design, fabrication and installation of Dual Redundant PLC-based System for Boiler Management System and Nitrogen Purging System including Alarm Monitoring Functions for the Systems.
  • Design, fabrication and installation of Automatic Control Valve System for Barrier and Inter Barrier Spaces, including Alarm Monitoring Function.

Length of Project:
Apr 2002 – Apr 2003
Customer:
Jurong Shipyard Singapore

Description of Work:

FSO KOMERKRIBI-1

  • Conversion of existing tanker into fuel storage and offloading unit involving electrical and instrumental work.

Length of Project:
Early 2002 - ONGOING
Customer:
Yokogawa Japan

Description of Work:

UPGRADE WORK FOR LNG CARRIER TENAGA-TIGA

  • Installation of new DCS systems for Engine Room and Cargo Control Systems.
  • 4 LNG carriers of Tenaga Fleet completed.

Length of Project:
Year 2002- Ongoing
Customer:
Shell IMR Japan

Description of Work:

UPGRADE OF 7 B-CLASS GAS VESSELS

  • Upgrading of HD Compressors Controls on 7 operational gas ships.

Length of Project:
June 2000 - 2004
Customer:
Yokogawa Japan

Description of Work:

TENAGA FLEET DCS IMPLEMENTATION
TENAGA-SATU, DUA, EMPAT & LIMA

  • Site survey during voyage.
  • Design, fabrication, System Integration of Marshalling Cabinets and consoles.
  • Design, construction, testing and commissioning of PLC based Extension Alarm Systems.
  • Design modifications and implementation of Boiler Control systems.
  • Installation of all panels and consoles during 90-day docking period at Yokohama. Japan

Length of Project:
June 2000 - July 2002
Customer:
Kuwait Oil Tanker Company (S.A.K.), Kuwait

Description of Work:

GAS AL MINAGISH

  • Design, construction installation and testing of dual redundant Alarm monitoring system for engine room, Cargo control room and Bridge.
  • Design, construction and testing of electrically operated system to replace obsolete, existing Pneumatic control system for Cargo and Ballast Valves.
  • Replacement of entire Engine Control Room and Cargo control room automation relay system.
  • Implementation of the above jobs at Singapore and Arab Shipbuilding and Repair Yard Co. ASRY. Bahrain.

Length of Project:
May 2002
Customer:
Yokogawa France S.A., France

Description of Work:

EXTENSION ALARM SYSTEM FOR HHI LNG CARRIER HULL NO. H1444

  • Design, Engineering, & Supply of Redundant PLC based gateway and Redundant Profibus based Extension Alarm Panels for LNG Carrier being built by HHI

Length of Project:
Mar 2002 - Apr 2002
Customer:
Kuwait Oil Tanker Company (S.A.K.), Kuwait

Description of Work:

GAS AL AHMADI

  • Design, construction installation and testing of dual redundant Alarm monitoring system for engine room, Cargo control room and Bridge.
  • Design, construction and testing of electrically operated system to replace obsolete, existing Pneumatic control system for Cargo and Ballast Valves.
  • Replacement of entire Engine Control Room and Cargo control room automation relay system. Design, construction and installation of Ballast Pump discharge Valve control system.
  • Implementation of the above jobs at Singapore and Dubai dry docks.

Length of Project:
Dec 2001 - Jan 2002
Customer:
Kuwait Oil Tanker Company (S.A.K.), Kuwait

Description of Work:

GAS AL BURGAN

  • Design, construction installation and testing of dual redundant Alarm monitoring system for engine room, Cargo control room and Bridge.
  • Design, construction and testing of electrically operated system to replace obsolete, existing Pneumatic control system for Cargo and Ballast Valves.
  • Replacement of entire Engine Control Room and Cargo control room automation relay system.
  • Implementation of the above jobs at Singapore and Dubai dry docks.

Length of Project:
Sep 2001 - July 2002
Customer:
Single Buoy Moorings Inc., Switzerland

Description of Work:

FPSO BRASIL

  • Design, construction, installation, testing and commissioning of H60 rated Turret Equipment Room complete with ventilation and air conditioning system for use in Class 1, Division 1 hazardous area.

Length of Project:
Dec 2000 - Mar 2001
Customer:
Sembawang Shipyard Pte Ltd

Description of Work:

FSO SOORENA

  • Conversion of an existing Oil Tanker into Fuel Storage and Unloading Unit, involving E & I works.

Length of Project:
Feb 2001
Customer:
Yokogawa France S.A., France

Description of Work:

EXTENSION ALARM SYSTEM FOR HHI LNG CARRIER HULL NO. H1429

  • Design, Engineering, & Supply of Redundant PLC based gateway and Redundant Profibus based Extension Alarm Panels for LNG Carrier being built by HHI.

Length of Project:
Sept 2000 - Mar 2001
Customer:
Sembawang Marine & Offshore Engineering

Description of Work:

MALAMPAYA PLATFORM

  • Commissioning of Controls and Safety System for Solar Gas Turbines, Speed Control and Safeties for Rolls Royce Engines for Gas Compressors, Controls and Safeties for Control Air Compressors, Fisher-Rosemount Delta-V DCS system field I/Os, Process Control Systems, Moore QUADLOG system for Fire, Gas and ESD.

Length of Project:
Aug 2000 - Nov 2000
Customer:
FPSO Construction Inc. (Brazil)

Description of Work:

FPSO PETROBRAS P-38

  • Commissioning of Process equipment, low and medium voltage switchboards, Vessel Monitoring System, Fire, Gas and ESD system, Installation of Process Instruments, Loop checking, quality assurance and documentation.
  • Calibration of Safety Valves, All monitoring, control and safety devices on the process equipment.
  • Running and operation of marine machinery.

Length of Project:
Jul 2000 - Nov 2000
Customer:
Nuovo Pignone (Italy)

Description of Work:

FPSO PETROBRAS P-40

  • Commissioning of Nuovo Pignone Mark-5 Gas Turbines, Installation of Process Instruments, Clearing of E&I punch list, Looping checking, quality assurance and documentation.
  • Calibration of all monitoring, control and safety devices on the process equipment and Running and operation of machinery.

Length of Project:
Aug 2000 - Dec 2000
Customer:
Rosemount Shanghai Co. Ltd, Shanghai, China

Description of Work:

  • Design, Engineering & Supply of Central Control Console including Emergency Shutdown System (Redundant PLC based), Extension Alarm System and Loading Calculation Software for Hull part of FPSO-2 being built by Dalian New Shipyard for CNOOC.

Length of Project:
Apr 2000 - Nov 2000
Customer:
Rosemount Shanghai Co. Ltd, Shanghai, China

Description of Work:

  • Design, Engineering & Supply of Central Control Console including Emergency Shutdown System (Redundant PLC based), Extension Alarm System, Lighting Monitoring Mimic Panels and Loading Calculation Software for Hull part of FPSO-1 being built by Dalian New Shipyard for CNOOC.

Length of Project:
June 2000 - Dec 2000
Customer:
Yokogawa France S.A., France

Description of Work:

EXTENSION ALARM SYSTEM FOR HHI LNG CARRIER HULLS NO. H1295 / 1296

  • Design, Engineering, & Supply of Redundant PLC based gateway and Redundant Profibus based Extension Alarm Panels for LNG Carriers being built by HHI.

Length of Project:
Oct 1999 - May 2001
Customer:
Aiolos Engineering Corporation, Canada

Description of Work:

LOW SPEED WIND TUNNEL UNIVERSITI TEKNOLOGI MALAYSIA

  • Design, Engineering, Supply, Installation and Commissioning of Electrical and Control systems including Computer Networking system.

Length of Project:
Nov 1999 - Nov 2000
Customer:
Baker Process

Description of Work:

FPSO PETROBRAS P-40

  • Commissioning and Installation of Process equipment, Clearing of E&I punch list, Loop checking, quality assurance and documentation
  • Calibration of Safety Valves, All monitoring, control and safety devices on the process equipment and running and operation of marine machinery.

Length of Project:
Oct 1999 - Apr 2000
Customer:
Shell International Trading and Shipping Co. Ltd

Description of Work:

LNG BONNY

  • DCS Retrofitting

Length of Project:
Sept 1999 - Mar 2000
Customer:
Keppel Shipyard Pte Ltd

Description of Work:

FPSO-VI, ESPADARTE

  • Renewal of burner management and combustion control system for 2 boilers.
  • Repair and reactivation of Engine Room Alarm Monitoring System.
  • Design of controls for about 27 motor starters for automatic and standby operation.
  • Loop checking, quality assurance and documentation.

Length of Project:
Aug 1999 - Feb 2000
Customer:
Maritima Overseas Inc. (Brazil)

Description of Work:

FPSO PETROBRAS P-37

  • Commissioning of Process equipment, low and medium voltage switchboards, vessel monitoring system, fire, gas and ESD system, Nuovo Pignone Mark-5 Gas Turbines, Installation of Process Instruments, Loop checking, quality assurance and documentation.
  • Calibration of Safety Valves, All Monitoring, Control and Safety devices on the process equipment and running and operation of marine machine.

Length of Project:
Aug 1999 - Sep 1999
Customer:
Stork Engineers and Contractors BV, Sri Lanka

Description of Work:

SHELL TERMINALS LANKA SRI LANKA

  • Design and Supply - Lighting columns & Control gear.

Length of Project:
Jan 1999 - June 1999
Customer:
PFV International, Singapore

Description of Work:

BAHAI PLATFORM J29-3 CHINA

  • Supply and Commission Explosion proof Oil in Water Analyzer.

Length of Project:
Jan 1999 - July 1999
Customer:
McDermott SEA, Singapore

Description of Work:

LB - 30

  • Design, Supply and Commission - Ballast Control system.

Length of Project:
June 1998 - Sep 1998
Customer:
Nortrans Engineering

Description of Work:

RUBY PRINCESS

  • Design and fabricate control panels.

Length of Project:
June 1998 - Sep 1998
Customer:
DDC Electronics Singapore

Description of Work:

DRILLSHIP - VALENTIN SHASHIN

  • Design and fabricate control panels.

Length of Project:
Sep 1998 - Dec 1998
Customer:
ST Marine Singapore

Description of Work:

RORO VESSEL 140M LANDING SHIP TANK

  • Supply of Hull Stress Monitor.

Length of Project:
Mar 1998 - Oct 1999
Customer:
Woodside Energy Ltd

Description of Work:

LAMINARIA & CORRALINA FPSO SEMBAWANG SHIPYARD

  • To provide Engineering Services for the FPSO conversion.

Length of Project:
Jan 1998 - Dec 1998
Customer:
Shell International Trading and Shipping Co. Ltd

Description of Work:

LNG FINIMA

  • DCS Retrofitting

Length of Project:
Jan 1998 - Dec 1998
Customer:
Sembawang Utilities and Terminals, Singapore.

Description of Work:

MAINTENANCE SERVICES SEMBAWANG UTILITIES AND TERMINALS - PULAU SAKRA

  • To provide maintenance services for the Boilers, Chilling water systems, Drumming systems, Tank farm, Electrochlorination systems and Electrical Substations.
  • To assist in the commissioning activities for the new Steam generation units - 3 nos.

Length of Project:
Jan 1998 - Dec 1998
Customer:
American Bureau Of Shipping

Description of Work:

PORT OF SINGAPORE AUTHORITY - PASIR PANJANG

  • To provide Inspection Services to ABS for 24 numbers of Overhead Bridge Cranes (OHBC) at the Pasir Panjang Terminal and site inspection services at the Mitsui-Keppel consortium construction site at Keppel Shipyard.

Length of Project:
Mar 1998 - Mar 2002
Customer:
TBV Power, Port Klang, Malaysia

Description of Work:

PORT KLANG POWER PLANT 2X600 MW
TENAGA NASIONAL BERHAD MALAYSIA

  • Provide Commissioning Services for the Instrumentation and Electrical systems.
  • Provide Operational Personnel for the operation of the plant upon successful completion of commissioning.

Length of Project:
Jan 1998 - Jun 1999
Customer:
Dubai Dry Docks, Dubai U.A.E.

Description of Work:

OPTIMIZATION OF FPSO COSSACK PIONEER

  • Provide E & I Works.
  • Upgrading of Control System for about 140 valves with renewal of control system and addition of extra accumulators, automating the controls of essential valves, and running of seamless hydraulic pipes.

Length of Project:
Aug 1997 - Oct 1999
Customer:
Trenergy FPSO Sdn. Bhd., Kuala Lumpur, Malaysia

Description of Work:

PERINTIS - FPSO MALAYSIA SHIPYARD & ENGINEERING

  • Engineering and Project Management Services for Trenergy FPSO to enable conversion of the MT HITRA into the FPSO PERINTIS for Petronas Carigali Bhd.
  • Enable successful commissioning to be completed at Malong, Sotong and Anding (MASA) oil field area in the South China Sea.

Length of Project:
Sep 1997 - Dec 1997
Customer:
Shell International Trading and Shipping Co. Ltd

Description of Work:

MV SOLARIS

  • Fire Damage Rebuild

Length of Project:
June 1997 - Nov 1997
Customer:
Gas Services Int., Singapore

Description of Work:

SEMISUBMERSIBLE FLOATING PRODUCTION PLATFORM -P27
PETROBRAS

  • Installation of instrumentation on the Process skids.

Length of Project:
Dec 1996 - Mar 1997
Customer:
Thorensen & Co. (Bangkok) Ltd, Bangkok, Thailand

Description of Work:

SWITCHBOARDS AND ALARM PANELS
M.V. HALLBORG

  • Totally refurbish burnt out switch boards, engine control consoles, replace burnt out cabling, test and commission the systems.

Length of Project:
Feb 1997 - Mar 1997
Customer:
Whitewood Maritime Inc.

Description of Work:

CONTROL PANELS

  • Fabricate Bow loading and Aft line control panels.

Length of Project:
Feb 1997 - Mar 1997
Customer:
Schlumberger / Flopetrol Services Inc.

Description of Work:

CRUDE METERING SKID

  • Design and fabrication of a two-run flow metering skid.

Length of Project:
Mar 1997 - Oct 1997
Customer:
Far East Levingston Shipbuilding Ltd., Singapore

Description of Work:

SAGA HULL B-241

  • Electrical installation and Cabling of various skids.

Length of Project:
Mar 1997 - Oct 1997
Customer:
Foster Wheeler Eastern Pte Ltd, Singapore

Description of Work:

CCR BOOSTER GAS COMPRESSOR PACKAGE MOBIL JURONG REFINERY

  • Installation, Testing and Commissioning of Electrical and Instrumentation works including supply of installation material.

Length of Project:
Jan 1997 - Apr 1997
Customer:
Sempec Utilities and Terminals Pte Ltd, Singapore

Description of Work:

SUT TERMINAL, PULAU SAKRA SINGAPORE

  • Installation and termination of cables and equipment on the Service Corridor.

Length of Project:
Dec 1996 - Mar 1997
Customer:
Sempec Utilities and Terminals Pte Ltd, Singapore

Description of Work:

SUT TERMINAL, PULAU SAKRA SINGAPORE

  • Pre-Commissioning checks for boiler and associated plants.
  • Prepare and clear punch lists.

Length of Project:
Dec 1996 - Mar 1997
Customer:
Sembawang Shipyard Ltd, Singapore

Description of Work:

FPSO II

  • Supply, install and commission numerous new instrumentation systems.
  • Refurbish existing instrument systems in engine room and on deck.
  • Upgrade of mooring buoy controls.
  • Engineering for Production systems.
  • Instrument and Electrical team secondment for final installation and commissioning of various instruments and electrical facilities during vessel's passage from Singapore to Brazil.

Length of Project:
July 1996 - Dec 1996
Customer:
Sembawang Shipyard Ltd, Singapore

Description of Work:

FPSO - TANTAWAN EXPLORER

  • Overhaul, reinstatement & modification of engine room control systems
  • Hookup and testing of deck process instrumentation.
  • Installation and testing of fire and Gas systems.
  • Startup and commissioning of process instrumentation.
  • Instrument Electrical teams secondment for the maintenance of various instruments and electrical facilities after vessel departed for Thailand.

Length of Project:
Oct 1995 - Aug 1996
Customer:
Foster Wheeler Eastern Pte Ltd, Singapore

Description of Work:

SAFE PROJECT INSTRUMENTATION

  • Perform Instrumentation and Electrical works as per scope of contract.
  • Install, test and commission Electrical equipment both on-site and off-site.
  • Install and termnate both Electrical and Instrument Cabling.
  • Provide Expatriate site Management Team.

Length of Project:
Feb 1995 - May 1995
Customer:
ACT Operators Group, Shenzen, China

Description of Work:

HZ-26 MODIFICATION SHEKOU OFFSHORE (CHINA)

  • Install, test and commissioning of Subsea cable, transformer system and panels.
  • Install, test and commissioning of electrical works (lighting, grounding and communication).
  • Install, test and commissioning of Instrumentation works, heat tracing for pipeline facilities and hydrocyclone.

Length of Project:
Dec 1993 - Dec 1995
Customer:
Sembawang Shipyard Ltd, Singapore

Description of Work:

DP PIPELAYING VESSEL - SOLITAIRE

  • Design, supply, install, test and commissioning for all controls and instruments at Machinery and Piping systems for Main diesel engines, Cooling water main systems, Sea cooling main system, Aux. Cooling water system, Lube oil system, Fuel system, Thruster and steering gear system, Ballast system, Bilge system, Engine control system, etc.
  • Install, test and commissioning of handling and mooring equipment including Pipe transfer cranes, Main deck overhead cranes, Overhead cranes in pipe transfer holds, Overhead cranes in double joint factory, double joint pipe elevator and double joint line-up crane.

Length of Project:
Dec 1995 - May 1996
Customer:
Dubai Dry Dock, U.A.E.

Description of Work:

FPSO CONVERSION NOKOSSA

  • Installation of new dual fired boiler control systems for Port and Starboard boilers.
  • General engine room instrumentaion.
  • Commissioning and plant startup services and assistance.

Length of Project:
Dec 1995 - June 1996
Customer:
Kvaerner Process Systems, Kuala Lumpur, Malaysia

Description of Work:

E&I WORKS FOR FPSO ESSO BALDER FOR NORWAY

  • Design, procure, construct and commission the electrical and instrument systems for crude oil production and gas dehydration process packages as well as test separation packages.
  • Calibration, loop checks and handover the systems.

Length of Project:
Dec 1995 - June 1996
Customer:
Kvaerner Process Systems, Kuala Lumpur, Malaysia

Description of Work:

E&I WORKS FOR WWTP GPP2 & GPP3
PETRONAS GAS BHD

  • Design, Procure, construct and commission the electrical and instrument systems for the waste water treatment plants for GPP2 & GPP3
  • Calibration, loopchecks and handover the systems

Length of Project:
May 1993 - June 1995
Customer:
BP Shipping, United Kingdom

Description of Work:

BOILER CONVERSION / UPGRADE FOR VLCC's
BRITISH SUCCESS, BRITISH SPIRIT, BRITISH SKILL, AUSTRALIAN ACHIEVER

  • Engineer, design, assemble, factory test new Portside & Starboard Boiler Automatic Combustion controls, Burner Management Systems, Burners, for the four vessels.
  • Install, commission and test run the systems during vessel docking in Singapore and the Middle East.

Length of Project:
Apr 1995 - May 1995
Customer:
Oil Equipment Manufacturing Pte Ltd, Singapore

Description of Work:

OCTANE ENGINE SYSTEM - ANALYZER HOUSE MOBIL REFINERY

  • Install, test and commissioning of three CFR engines.
  • Install, test and commissioning of sample conditioning panel and distribution equipment main panel.
  • Install, test and commissioning of cabling, electrical equipment and instrumentation systems.
  • Installation of eight prototype fuel tanks and two buffer tanks.

Length of Project:
July 1994 - July 1995
Customer:
Keppel Shipyard Limited, Singapore

Description of Work:

FPSO CONVERSION - COSSACK PIONEER

  • Service, Supply, installation and commissioning of machinery and instruments for Main Port and Stbd Boiler related conversion systems.
  • Design, fabrication, installation and commissioning of IGS control panel and installation of instruments for IGS system.
  • Supply, fabricate and installation of pumproom machinery and piping.· Supply equipment for new Fire Water System.

Length of Project:
June 1994 - Oct 1994
Customer:
Keppel Shipyard Limited, Singapore

Description of Work:

FPSO - BAVI

  • Material procurement, detail engineering, installation and precommissioning of process monitoring control panel and cargo valve hydraulic control panel.
  • Install hydraulic system tubing and offskid instruments.

Length of Project:
Feb 1994 - Oct 1994
Customer:
Keppel Shipyard Limited, Singapore

Description of Work:

FPSO - NAN HAI KAI TUO

  • Material procurement, detailed engineering, installation and pre-commissioning of various engine room's instrumentation up-grading to meet the FPSO conversion new requirements.
  • Installation and precommissioning of process shut down system, inclusive of tubing installation and cable termination.
  • Modify the deck process skids' instruments and electrical installation.
  • Precommissioning of the entire process skids' instrumentation and control system.

Length of Project:
Dec 1993 - Apr 1994
Customer:
Mobil Refinery, Singapore

Description of Work:

AROMATIC / CCR PROJECT

  • Provide Instrument Technicians to assist Mobil Refinery's commissioning team on plant start-up activities. Work includes final tuning and optimum setting of field instruments, trouble shooting and rectification of faults occurring during plant start-up period.

Length of Project:
Aug 1993 - Apr 1994
Customer:
Asia Badger Inc.

Description of Work:

AROMATIC / CCR PROJECT

  • Provide Instrument engineers to review vendor's drawings and incorporate vendor's instruments into refinery plant instrumentation and system.
  • Provide Instrument Technicians and skilled Fitters/Electricians to carry out site installation of vendor package's instruments and punchlist items of other sub-contractors instrument installation work and its tubing conduits, trays, cables and supports.
  • Provide Instrument Technicians to perform loopchecking and fault finding activities during the precommissioning of plant.
  • Provide Instrument Technicians to perform mark-up of as-built drawings.

Length of Project:
Dec 1993 - Jan 1994
Customer:
JHN Oil Operating Co., China

Description of Work:

LF-13-1 PLATFORM

  • Reactivation of Instrumentation and control work involving calibration, overhauling and loop-checking of process instruments, modification of Process instrumentation and SCADA system.
  • Commissioning and startup of process plant and instrumentation.

Length of Project:
Oct 1992 - Jan 1993
Customer:
Sembawang Shipyard Ltd, Singapore

Description of Work:

FPSO - NIELSTOR

  • Refurbishment and modification of hydraulic remote control cargo valve system.
  • Installation and commissioning of FPSO process instrumentation.

Length of Project:
Aug 1992 - Oct 1992
Customer:
Asia Badger Inc.

Description of Work:

INSTRUMENTATION REVAMP PROJECT

  • Provide Instrument technicians and skilled fitters to work on calibration, and loop checking instrumentation revamp work.

Length of Project:
Feb 1992 - July 1992
Customer:
Keppel Shipyard Limited, Singapore

Description of Work:

FPSO - NAN HAI XI WAN

  • Refurbishment of deck process instruments and control equipments.

Length of Project:
Jan 1992 - June 1992
Customer:
Single Buoy Moorings Inc., Switzerland

Description of Work:

FPSO-II

  • Refurbishment of Deck process instruments and control equipments.
  • Refurbishment of engine room's dual fire boiler control equipments and auxiliary steam plant instruments.
  • Supply and commissioning of Chemical injection skid.
  • Commissioning and plant start up assistance of West Linapacan field offshore, Philippines.

Length of Project:
June 1991 - Dec 1991
Customer:
Keppel Shipyard Limited, Singapore

Description of Work:

FPSO SKUA VENTURE

  • Installation and hook up of various offskid instruments and termination of control console.
  • Service and commissioning of Engine room automation and Boiler control instrumentation.

Length of Project:
Jan 1991 - Aug 1991
Customer:
Boustead Service Pte Ltd, Singapore

Description of Work:

COMPUTERISATION OF PSA CRANES PSA SINGAPORE

  • Installation and testing of Computerised system for 220 units of PSA yard cranes and quay cranes.

Length of Project:
Dec 1990 - Feb 1991
Customer:
Single Buoy Moorings Inc., Switzerland

Description of Work:

FPSO CHI LINH
VIETNAM WHITE TIGER FIELD

  • Start up and commissioning of process instruments and electrical commissioning.

Length of Project:
Apr 1990 - Oct 1990
Customer:
Keppel Shipyard Limited, Singapore

Description of Work:

FPSO CHI LINH

  • Material Procurement, detail engineering, installation and pre-commissioning of various instruments.
  • Design, fabricate, install and test the process control panels.
  • Installation and pre-commissioning of Fire and Gas system, ESD control panel and system.

Length of Project:
Oct 1990 - Oct 1992
Customer:
ACT - OG, Shenzen, China

Description of Work:

FPSO - NAN HAI FA XIAN
HZ-21, HZ-26 PLATFORM OFFSHORE CHINA

  • Start up and commissioning FPSO process instruments, fire and gas system and tanker facilities.
  • Hook up and commissioning of Well-head safety shut- down system.
  • Start up and commissioning of Oil and gas Production facilities.
  • Instrument and Electrical Team secondment to the maintenance of various instruments and electrical facilities.

Length of Project:
Jan 1990 - Aug 1990
Customer:
Sembawang Shipyard Ltd, Singapore

Description of Work:

FPSO - NAN HAI FA XIAN

  • Supply, installation and commissioning of Deluge Control System
  • Evaluation and selection of Process Instruments for configuration according to specifications.
  • Installation, hook up, calibration and pre-commissioning of FPSO process instruments.

 

 

Business
Business Overview
Our Scope of Work
Business Model
Service & Repair
Project & System Integration
Manufacturing & Gauging
Why Total Automation?
Our Customers
Major Projects
Our Future Direction